FER Rates 2026: federal unit rates database online
Need a FER rate for HVAC installation or concrete work — you open FGIS CS, enter a suspected code, get 47 collections and spend 30 minutes searching for the right item. Without knowing the exact classification code, the search becomes a guessing game. Over a quarter, these searches add up to 10-15 hours of wasted time. An AI bot finds the right FER rate in 5 seconds from a plain work description.

Key facts
- FER — Federal Unit Rates priced at 2001 base with Ministry of Construction index conversion
- FSNB-2022 (current database): 47 FER collections plus FERm, FERr, FERp series
- Online references require knowing the exact code (e.g. FER 08-01-002-01)
- AI finds FER rate in 5 seconds from a description: "galvanized steel duct installation"
During rollout planning for timematerial, the recurring issue was not feature quantity but whether a buyer could verify limits, exports, integrations, and ownership before committing.
What is the Difference Between FER, GESN and TER?
Understanding the distinctions helps choose the right calculation method for your project.
| Criterion | GESN | FER | TER |
|---|---|---|---|
| Essence | Resource norms in physical units | Monetary rates (2001 base) | Regional monetary rates |
| Calculation method | Resource-based | Base-index | Base-index |
| Mandatory for | Resource method | Federal budget (44-FZ) | Regional projects |
| Current database | GESN-2020 | FSNB-2022 | By region |
FER is mandatory for government contracts under 44-FZ. For private projects, TER or the resource method with GESN is allowed.
How to Find a FER Rate in 3 Steps?
Instead of browsing 47 collections of 200+ pages each — describe the work in the Telegram bot.
Step 1. Open @timematerial_bot and describe the work: "Galvanized steel ductwork installation", "Concrete floor 100mm thick", "Brick partition wall construction".
Step 2. AI suggests 2-3 matching FER rates with code, work composition, and measurement units. No need to know the collection number.
Step 3. The bot applies Ministry conversion indices (Q1 2026) and calculates cost at current prices for your work volume.
Comparison: Where to Search FER Rates?
| Method | What you need to know | Speed | Price |
|---|---|---|---|
| FGIS CS (Ministry) | Exact code or section | 20-40 min | Free |
| Online references (fgisrf.ru, defsmeta.com) | Rate code | 5-15 min | Free / registration |
| Grand Smeta | Interface (2-3 weeks training) | 3-5 min | from $500/year |
| TimeMaterial AI | Plain language work description | 5 sec | $50/mo |
FAQ
What is the difference between FER and GESN? GESN provides resource norms in physical units. FER covers the same works with monetary rates at 2001 base prices, recalculated via indices.
Which database is current? FSNB-2020 with supplements + FSNB-2022. Updates published quarterly on FGIS CS.
Is FER mandatory? For federal budget (44-FZ) — yes. For private projects, TER or resource method with GESN is allowed.
What are FERm, FERr, FERp? FERm — installation works, FERr — renovation works, FERp — commissioning works. All included in FSNB-2022.
Automation cost — $300 per project. Write on Telegram: @onoutnoxon — we will review your estimating task.
Learn more: TimeMaterial — AI-powered estimate automation.
See Also
- GESN Rates 2026: how to find in 3 seconds without software
- Estimate GESN Rate 2026: how to apply without errors
- Construction Estimating Software Comparison 2026
Updated: 2026-03-05.
Sources: - https://fgiscs.minstroyrf.ru/frsn/fer/index - https://fgisrf.ru/fer/ - https://minstroyrf.gov.ru/docs/1968/ - https://expertsmet.ru/articles/chto-takoe-fer/
AI-assisted editorial update for "FER Rates 2026: federal unit rates database online"; final responsibility and review: Alexander Ruin, founder of onout.org. Updated: 2026-05-01.
About the service "FER Rates 2026: federal unit rates database online"
FER rates 2026 online: find federal unit construction rates in 5 seconds via AI bot. Current FSNB-2020/2022 database, all FER collections without registration.